小程序
公众号
注册/登录
试题搜索
用看的、听的学真题
study by eyes and ears.
2023数据库系统工程师真题参考答案火热出炉
首页
数据库系统工程师
2004年05月数据库系统工程师考试上午真题【基础知识】
真题列表
2004年05月数据库系统工程师考试上午真题【基础知识】
内容:基础知识
时间:150分钟
总分:75分
题数:75题
【60】下面描述正确的是
(60)
。
真题详情及解析
【61】以太网100BASE-TX标准规定的传输介质是
(61)
。
真题详情及解析
【62-63】许多网络通信需要进行组播,以下选项中不采用组播协议的应用是
(62)
。在IPv4中把
(63)
类地址作为组播地址。
真题详情及解析
【64】将双绞线制作成交叉线(一端按EIA/TIA568A线序,另一端按EIA/TIA568B线序),该双绞线连接的两个设备可为
(64)
。
真题详情及解析
【65】以下
不属于
中间件技术的是
(65)
。
真题详情及解析
【66-70】Networks can be interconnected by different devices. In the physical layer, networks can be connected by
(66)
or hubs, which just move the bits from one network to an identical network. One layer up we find bridges and switches, which operate at data link layer. They can accept
(67)
, examine the MAC address, and forward the frames to a different network while doing minor protocol translation in the process. In the network layer, we have routers that can connect two networks. If two networks have
(68)
network layer, the router may be able to translate between the packet formats. In the transport layer we find transport gateway, which can interface between two transport connections. Finally, in the application layer, application gateways translate message
(69)
. As an example, gateways between Internet e-mail and X.400 e-mail must
(70)
the e-mail message and change various header fields.
真题详情及解析
【71-75】The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable (71 ) of the technical requirements for the software product.
During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each
(72)
that it must meet. The starting point is usually a set of high-level requirements from the
(73)
that describe the project or problem.
In either case, the requirements definition team formulates an overall concept for the system and then defines
(74)
showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review(SCR).
Following the SCR, the team derives
(75)
requirements for the system from the high level requirements and the system and operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
真题详情及解析
首页
上一页
1
2
3
4
5
6
末页
广告位